Case study — Heritage decoration

Brighton Pavilion: heritage decoration and sash window restoration

Specialist painting and listed building decoration at one of Britain's most recognisable heritage landmarks — delivered for DBR Restoration while the Pavilion remained open to visitors.

External decoration and restoration at Brighton Pavilion

Client

DBR Restoration

Location

Brighton

Sector

Heritage

Programme

Completed 2025

The project

GSD was appointed by DBR Restoration to carry out the external redecoration of Brighton Pavilion: a complete overhaul of the sash windows, including glazing repairs, alongside the redecoration of external masonry and metalwork.

Heritage conservation work of this kind demands more than a good finish. Surfaces are prepared and decorated to conservation standards, colours are matched to the historic scheme, and every detail is agreed with the conservation team before work begins — the discipline that separates heritage decorating from general painting.

Scope of works

Complete overhaul of sash windows, including glazing repairs

Redecoration of external masonry

Preparation and decoration of external metalwork

Colour matching to the historic decorative scheme

Protection and sequencing around a live visitor attraction

Systems and finishes

Masonry-grade coating systems were used across the external render and stonework, with Dulux systems specified for the sash windows and metalwork — chosen for durability in an exposed coastal setting and a finish sympathetic to the building's character.

Rooftop detail during heritage decoration at Brighton Pavilion

What made this heritage-grade work

Listed building painting is judged on the decisions you make before the first coat, not just the finish.

Conservation liaison

Works carried out within listed-building consent, with methods and materials agreed through conservation officer liaison.

Traditional sash craft

Sash windows overhauled and repaired using traditional methods — restored, not replaced.

Historic colour matching

Finishes matched to the Pavilion's historic decorative scheme rather than an off-the-shelf colour card.

A live visitor attraction

The Pavilion stayed open throughout. Hoarding, protection and sequencing kept visitors safe and the attraction trading.

Access on a sensitive facade

Scaffold access designed around the building's ornate fabric and visitor routes — protecting minarets, domes and stonework while giving trades safe access to every elevation.

Scaffold access and hoarding during external redecoration of Brighton Pavilion

Planning heritage decoration or window restoration?

Talk to the team that delivered Brighton Pavilion.