Stroud Green Primary School

Window overhaul and decoration at Stroud Green Primary School

Stroud Green Primary School yellow-brick elevation, white sash windows and playground, London
PROJECT OVERVIEW

Window overhaul, Repair Care timber repairs and decoration at Stroud Green Primary School, London, for Diamond Build — commercial decorating.

We were appointed by Diamond Build to overhaul the windows and decorate at Stroud Green Primary School. The package was window overhaul, Repair Care timber repairs and decoration. That is the job we came to do, and that is the job we finished.

This is the commercial painting and decorating we do on London schools: overhaul, Repair Care where the timber needs it, and decoration, reported to the main contractor.

A primary school elevation is judged from the street and the playground as much as it is judged on a snag list. The windows have to operate, the timber repairs have to take decoration, and the finished work has to look like one piece rather than a run of patched frames.

The project

Stroud Green Primary School is an education building. We worked for Diamond Build as the decorating and window-overhaul trade. An overhaul is not a paint-only instruction. The windows have to be taken through repair and eased so they run, then decorated so the repair and the existing timber read as one finish.

Repair Care is part of this package because window timber fails in patches, not as a uniform board. Where timber needed rebuilding, we used Repair Care rather than dressing over decay and hoping the decoration would hide it. Decoration followed the overhaul so we were not painting windows that still needed to be eased, cut back or rebuilt.

The work on this job was window overhaul, Repair Care timber repairs and decoration. We reported that package to Diamond Build and closed it as one piece of work, not as a set of separate visits.

The client relationship sat with Diamond Build. Their site team set the sequence, received the queries and closed the package. We did not take a separate brief from the school office. Window work on a primary school has to sit inside the main contractor's protection, access and handover rules, and that is how we ran it.

What we did

  • Window overhaul
  • Repair Care timber repairs
  • Decoration

Working on this site

Working on this site meant treating the windows as both joinery and elevation, on a primary school. Windows come off for overhaul and go back into the same openings. While they are out, the opening has to stay weathertight. While they are being decorated, the finish has to be kept clean until it is hard enough to handle.

Repair Care is a timber repair system, not a filler. Failed sections are cut back to sound material and rebuilt so the repair will take a full decoration. The point of using the system on this job was to leave a substrate that would hold the finish, not a soft edge that would show through after the first season of weather.

Decoration on an overhaul comes last. Frame and the repaired timber are prepared and finished after the mechanical work is done. Paint first and ease later and you mark the work. We finished after the window had been repaired and was running.

A primary school site also means control of dust, debris and wet paint next to the building's public face. We worked inside the protection Diamond Build set up, kept the working zone clean, and handed each stage back in a condition the next trade — or the school — could live with.

At Stroud Green Primary School, for Diamond Build, that is the job we did — window decorating of the kind we take across London and the South East.

We are CHAS and SSIP accredited and 100% RIDDOR-free.

LOCATION:
Stroud Green Primary School
VALUE:
£375,000
CLIENT:
Diamond Build
SECTOR:
Education

We were appointed by Diamond Build to overhaul the windows and decorate at Stroud Green Primary School. The package was window overhaul, Repair Care timber repairs and decoration. That is the job we came to do, and that is the job we finished.

This is the commercial painting and decorating we do on London schools: overhaul, Repair Care where the timber needs it, and decoration, reported to the main contractor.

A primary school elevation is judged from the street and the playground as much as it is judged on a snag list. The windows have to operate, the timber repairs have to take decoration, and the finished work has to look like one piece rather than a run of patched frames.

The project

Stroud Green Primary School is an education building. We worked for Diamond Build as the decorating and window-overhaul trade. An overhaul is not a paint-only instruction. The windows have to be taken through repair and eased so they run, then decorated so the repair and the existing timber read as one finish.

Repair Care is part of this package because window timber fails in patches, not as a uniform board. Where timber needed rebuilding, we used Repair Care rather than dressing over decay and hoping the decoration would hide it. Decoration followed the overhaul so we were not painting windows that still needed to be eased, cut back or rebuilt.

The work on this job was window overhaul, Repair Care timber repairs and decoration. We reported that package to Diamond Build and closed it as one piece of work, not as a set of separate visits.

The client relationship sat with Diamond Build. Their site team set the sequence, received the queries and closed the package. We did not take a separate brief from the school office. Window work on a primary school has to sit inside the main contractor's protection, access and handover rules, and that is how we ran it.

What we did

Working on this site

Working on this site meant treating the windows as both joinery and elevation, on a primary school. Windows come off for overhaul and go back into the same openings. While they are out, the opening has to stay weathertight. While they are being decorated, the finish has to be kept clean until it is hard enough to handle.

Repair Care is a timber repair system, not a filler. Failed sections are cut back to sound material and rebuilt so the repair will take a full decoration. The point of using the system on this job was to leave a substrate that would hold the finish, not a soft edge that would show through after the first season of weather.

Decoration on an overhaul comes last. Frame and the repaired timber are prepared and finished after the mechanical work is done. Paint first and ease later and you mark the work. We finished after the window had been repaired and was running.

A primary school site also means control of dust, debris and wet paint next to the building's public face. We worked inside the protection Diamond Build set up, kept the working zone clean, and handed each stage back in a condition the next trade — or the school — could live with.

At Stroud Green Primary School, for Diamond Build, that is the job we did — window decorating of the kind we take across London and the South East.

We are CHAS and SSIP accredited and 100% RIDDOR-free.